top of page

Gem County Fire Protection District #2 Driveways

#1 Apply for an address with Gem County (Gemcounty.Org) Development Services, Development Services Applications, Address Request

 

#2 Mark the Driveway with the address on a reflective sign that we can find both for inspections and for emergency response

 

# 3 Print the Gem County Fire Protection District #2 Permit Application  

​

#4  Complete - Do not leave any section blank - Send the application with a check for $200 for your permit to 6922 Sweet Ola Highway, Sweet Idaho  83670. 

​

#5 We will contact you to arrange a site visit and then issue a permit if it has not been completed in advance. 

Print the road specs, so you or your builder can complete the process. SPECS

​​

#6  Contact us for final inspection with compaction test emailed in advance to gemfire2board@gmail.com or call 208-593-0221.

Make sure your test indicates 95% or greater compaction at each testing location.

​

County Code:

11-23-1: Driveway Standards

11-23-1:   DRIVEWAY STANDARDS:

   A.   Applicability. All new or expanded driveways shall demonstrate compliance with the following design standards.

   B.   Design Standards. Driveways shall be constructed to standard engineering specifications for an all-weather driveway that meets Gem County fire district standards.

      1.   Driveways shall not exceed seven (7) percent grade. Exception to this standard may be granted by the Fire District, however, the County will not accept roads in excess of seven (7) percent grade for public dedication.

      2.   Driveways shall have a minimum driving surface width of twenty (20) feet.

      3.   Driveways shall meet all fire district standards for length and turnarounds.

      4.   All shared driveways connecting to a paved roadway shall include a paved approach to the driveway per county road and bridge standards.

      5.   Existing ditch or canal roads shall not be utilized as access.

      6.   Driveways may cross ditch or canal roads with a crossing license or agreement that includes the provision of a culvert or bridge as approved by the ditch or canal company and fire district to ensure existing water flow is not inhibited. Culvert or bridge shall be per Gem County road and bridge standards if within the county right-of-way.

      7.   All road intersections shall comply with sight triangle requirements per the Gem County road and bridge standards.

   C.   Access to a parcel of land to be used as a building site that does not have contiguous road frontage shall include a minimum forty (40) foot wide recorded easement, right of way, or deeded strip of land for driveway access. (Ord. 2025- 06, 3-24-2025)

​

​​​

​Below is a list of known companies (no preference) to obtain your compaction test.

Idaho Testing & Inspection, Inc. 208-463-0003

www.oneatlas.com 208-376-4748

www.allwesttesting.com 208-895-7898

​

Requests for initial and final inspections can take up to 15 days.

​

​

​

​

​

​

20261008_080530.jpg

© 2025

bottom of page